发现 Skills
为真实工作流程挑选经过整理的 Skill,连接、安装并开始使用。
carbon-calculator
Calculate embodied carbon in construction materials. Track CO2 emissions, compare alternatives, and generate sustainability reports.
change-order-analysis
Analyze and predict construction change orders using ML. Classify change order types, predict costs and schedule impacts, identify patterns, and optimize approval workflows.
change-order-processor
Process and manage construction change orders. Track costs, approvals, and impact on schedule and budget.
clash-detection-analysis
Detect and analyze geometric clashes between BIM elements. Identify hard clashes, soft clashes, and workflow conflicts using spatial analysis and rule-based detection.
clash-resolution-analyzer
Analyze BIM clash detection results and suggest resolutions. Prioritize clashes, identify patterns, assign responsibility, and track resolution status.
co2-estimation
Calculate carbon footprint of construction projects. Estimate CO2 emissions from materials, transportation, and construction processes using emission factors databases.
compliance-tracker
Track regulatory compliance for construction projects. Monitor permits, certifications, inspections, and regulatory requirements with automated alerts and reporting.
cost-prediction
Predict construction project costs using Machine Learning. Use Linear Regression, K-Nearest Neighbors, and Random Forest models on historical project data. Train, evaluate, and deploy cost prediction models.
critical-path-analyzer
Analyze project critical path from schedule data. Identify critical activities, calculate float, and assess schedule risk.
cwicr-comparison-tool
Compare cost estimates across projects, versions, and scenarios. Identify variances, benchmark against standards, and generate comparison reports.
cwicr-cost-calculator
Calculate construction costs using DDC CWICR resource-based methodology. Break down costs into labor, materials, equipment with transparent pricing.
cwicr-crew-optimizer
Optimize crew composition using CWICR labor norms. Balance productivity, cost, and skill requirements for construction crews.
cwicr-equipment-planner
Plan equipment requirements using CWICR norms. Calculate equipment hours, scheduling, utilization rates, and rental vs purchase analysis.
cwicr-escalation
Apply price escalation to CWICR estimates over time. Calculate inflation adjustments, material price indices, and labor rate increases.
cwicr-historical-cost
Track and analyze historical cost data using CWICR. Compare actual vs estimated costs, build project cost database, and improve future estimates.
cwicr-rate-updater
Update CWICR resource rates with current market prices. Integrate external price data, apply inflation adjustments, and maintain rate history.
cwicr-schedule-integrator
Integrate CWICR cost data with project schedules. Link work items to schedule activities, generate cost-loaded schedules, and cash flow projections.
cwicr-subcontractor
Analyze and compare subcontractor bids against CWICR benchmarks. Evaluate pricing, identify outliers, and support negotiation.
cwicr-value-engineering
Perform value engineering analysis using CWICR data. Identify cost-saving alternatives while maintaining function and quality.
data-lineage-tracker
Track data origin, transformations, and flow through construction systems. Essential for audit trails, compliance, and debugging data issues.
data-source-audit
Comprehensive audit of all construction data sources and systems. Map data flows, identify silos, assess quality, and create integration roadmap.
data-type-classifier
Classify construction data by type (structured, unstructured, semi-structured). Analyze data sources and recommend appropriate storage/processing methods
delay-analysis
Analyze construction schedule delays for claims and recovery. Perform time impact analysis, identify delay causes, calculate damages, and document for disputes.
df-merger
Merge pandas DataFrames from multiple construction sources. Handle different schemas, keys, and data quality issues.